Wide application of finned tube radiators
SA179 SMLS finned tubes for heat exchanger,air cooler
Base tube material: SA179 SMLS 25mmOD*3mmTHK*5970mmLG
Fin Material: AL1060; OD57.15mm X 10FPIX 0.4 mm THK
Manufacturing Process:
Finned tube is composited with iron-aluminum or copper-aluminum tube rolling out the fin, which feathers are tightness, small heat resistance, good heat transfer performance, high strength, small flow losses, strong corrosion resistant performance, not easy to deformation and a long working lifetime in cold and hot condition,etc.
The fin givescomplete protection to the base tube and is much stronger than the applied type due to work hardening of the fin material during the extrusion process.
Uppertemperature limit: 350°
Material: Aluminum, Copper, Carbon Steel, Alloy.etc.
ASTM A179/A192ASTM A106/A53,ASTM/ASME SA210,ASTM A213
Bare tube OD: 8-51mm Fin Pitch: 1.6-10mm Fin Height:
Application: mainly used in petrochemical, electric power, paper making, building heating and other industry such as air cooler, air heater and air heater of food industry, plant starch spray drying system.
Capacity: Thirty extrusion fining lines, daily capacity around 10000 meters
Products&Inspection Deatails:
Visual inspection for the tube
Following documentations should be reviewed & endorsed:
Incoming inspection report for raw material including bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports
Packaging: sea worthy with plastic cap for each edge of core tube , Finned tube shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins
About Our main business
A——DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube;
High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube;
Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube.
About Price terms
A——It could be EXW, FOB,CIF,CNF
About Payment Term
A——We usually accept payment by T/T in advance or by L/C available against draft at sight
About Lead Time
A——Usually it takes about 35-45 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.
About Quality Control
A—-
Incoming inspection report for bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports
About Sample
A—If you are interested in our above products, please contact us.
We can provide small samples in store for you, and you are welcome to visit visit our factory
Our moulds can be customized,you could kindly leave an inquiry to know more details about price, packing and shipping.